Yahya Alzeir Logo
HomeServicesProjectsContact
Back to Projects
AL WARGAA FIRST MASJID

AL WARGAA FIRST MASJID

Consultant

FUTURE ART ENGINEERING CONSULTANCY

Contractor

ALRAMS PRIME CONSTRUCTION

Location

Al Wargaa First, Dubai, UAE

Completion

2024

Project Overview

ALL WORKS OF THE HVAC SYSTEM FOR GROUND ONLY MASJID, PLOT- 4210771, AL WARGAA FIRST, DUBAI, UAE

Scope of Work

Implementation of specialized HVAC systems designed specifically for mosque requirements, featuring silent operation and optimal air distribution for the main prayer hall. The project includes advanced temperature and humidity control systems to ensure comfort during prayer times with varying occupancy levels. Special attention is given to energy efficiency while maintaining excellent ventilation for large gatherings. The system design complements the mosque's contemporary architectural features including the dome and high ceilings, with particular focus on managing air flow patterns in the expansive prayer spaces.

Systems Installed

  • Specialized Prayer Hall HVAC
  • High-Volume Air Distribution
  • Smart Temperature Control
  • Energy Efficient Design
  • Humidity Management
  • Quiet Operation System
  • Fresh Air Ventilation
  • Zone-Based Climate Control

Categories

ReligiousIslamic ArchitectureContemporary DesignCommunity Facility